Home > Vinyl Flooring > Majesty

• Hardwearing Vinyl Floor covering in elegant and realistic wood designs
• Excellent resistance to scratches, abrasion, soiling and staining.
• Ideal for showroom, HOTELS and leisure enviroments

Light Beige MP353004
Brown MP353037
Burnt Orange MP353039
Dark Beige MP305008
Beige MP305047
Brown MP305037
C Rosewood MP305955
Beige MP117047
Natural MP117005
Ddish Brown MP117048
Opal Grey MJ352002
Cream MP351013
Burnt Orange MP351039
CN Natural MP351985
Opal Blue MJ352010
Technical Specification
       Installation & Maintenance

The Sub Floor

Sub floor plays important role for any type of installation job, hence it is important to ensure that sub floor is
evenly levelled, dry, tuff and ready for PVC flooring installation

General guidelines for making sub floor.

Base floor should have following properties:

• Absolutely hard, level, dry, smooth and ready for installation.
• Free from cracks, irregularities , If any should be corrected with appropriate material.
• No contamination with oil, grease, paint or any other substance which affects the adhesion.
• Use cement based products for sub floor preparation and should be evenly spread
• Flat surface with maximum deflexion for 2m spirit level : for 0.20m spirit level : 2mm
• Moisture content should not be more than 75% R.H. Drying time is required of approximately 1 day per to be measured.
• Smoothing compound to use for perfectly smooth floor.
• Floor covering should be laid up to the joints and joints to be covered with an plastic or metal joint cover
• Damp proof membrane to laid before installation in case of sub floor direct to ground. This membrane act as a water proof layer.
• If there is old carpet, old vinyl, linoleum or rubber flooring already laying remove, clean and apply smoothing compound

Sheet laying method:

• The unrolled sheet must left in the room to be covered
• Vinyl sheet to be laid length wise in the same direction.
• Fold back sheet half way. • Apply Rubber based / Acrylic emulsion adhesive
• Long open time of adhesive will lead to poor transfer of Adhesive. Less open time of adhesive will lead to bubble formation. Refer Adhesive manufacturer’s instruction manual
• Smooth down manually and then roll with a 65 kg flooring roller
• Grooving and Hot welding to be done after 24 hours
• Do not traffic the floor coverings for 48 hours after installation

Maintenance

• Vinyl Flooring can be cleaned daily with a damp mop and weekly or fortnightly with a mild soap solution.
• Severely soiled or floors with stubborn stains can be cleaned with the use of a coir brush or fine steel wool no. 000 soaked in warm soap solution to clean the affected area.
• Clear water mopping is necessary to remove chemical spillage on the flooring and after scrubbing operation to remove residue.
• Do not throw lit cigarette butts or match sticks on the floor.
• Avoid dragging heavy furniture / objects to prevent scratches.
• Application of wax polish or floor finish should never be used as it will build up an insulating film on the surface

       Open e-brochure

 

Enquiry Now

Our Clients

tata-motors
logo_mahindra_rise
ashok-leyland
smlisuzu
tvs
svkm
volvo
toyota
maruti-suzuki
nissan
infiniti-mall
honda
eicher
cvgrp
baggit_logo
lear_logo
vip_logo