Home > Vinyl Flooring > Sonata

• Sonata is the perfect solution for the discerning bus and coach builders and fleet owners who want flooring to be utmost safe yet aesthetically pleasing
• 1 mm homogenous wear layer provides long-life slip resistance with a deep inlay of silicon carbide granules and color chips
• Excellent resistance to scratches, abrasion, soiling and staining
• Glass fibre scrim for dimensional stability
• Non-woven backing enhances sub-floor adhesion

Navy Blue ST2032
Light Blue ST2152
Alert Yellow ST2011
Earthen Brown ST2151
Korunde Grey ST2201
Grey ST2002
Dark Grey ST2147
Green ST2041
Beige ST2047
Rustic Brown ST3000
Craft Brown ST2073
Terracotta ST2957
Electricity RU2621
Blue Pottery RU2620
Tidal Wave RU2626
Mystic Green RU2624
Technical Specification
       Installation & Maintenance

The Sub Floor

Sub floor plays important role for any type of installation job, hence it is important to ensure that sub floor is
evenly levelled, dry, tuff and ready for PVC flooring installation

General guidelines for making sub floor.

Base floor should have following properties:

• Absolutely hard, level, dry, smooth and ready for installation.
• Free from cracks, irregularities , If any should be corrected with appropriate material.
• No contamination with oil, grease, paint or any other substance which affects the adhesion.
• Use cement based products for sub floor preparation and should be evenly spread
• Flat surface with maximum deflexion for 2m spirit level : for 0.20m spirit level : 2mm
• Moisture content should not be more than 75% R.H. Drying time is required of approximately 1 day per to be measured.
• Smoothing compound to use for perfectly smooth floor.
• Floor covering should be laid up to the joints and joints to be covered with an plastic or metal joint cover
• Damp proof membrane to laid before installation in case of sub floor direct to ground. This membrane act as a water proof layer.
• If there is old carpet, old vinyl, linoleum or rubber flooring already laying remove, clean and apply smoothing compound

Sheet laying method:

• The unrolled sheet must left in the room to be covered
• Vinyl sheet to be laid length wise in the same direction.
• Fold back sheet half way. • Apply Rubber based / Acrylic emulsion adhesive
• Long open time of adhesive will lead to poor transfer of Adhesive. Less open time of adhesive will lead to bubble formation. Refer Adhesive manufacturer’s instruction manual
• Smooth down manually and then roll with a 65 kg flooring roller
• Grooving and Hot welding to be done after 24 hours
• Do not traffic the floor coverings for 48 hours after installation

Maintenance

• Vinyl Flooring can be cleaned daily with a damp mop and weekly or fortnightly with a mild soap solution.
• Severely soiled or floors with stubborn stains can be cleaned with the use of a coir brush or fine steel wool no. 000 soaked in warm soap solution to clean the affected area.
• Clear water mopping is necessary to remove chemical spillage on the flooring and after scrubbing operation to remove residue.
• Do not throw lit cigarette butts or match sticks on the floor.
• Avoid dragging heavy furniture / objects to prevent scratches.
• Application of wax polish or floor finish should never be used as it will build up an insulating film on the surface

       Open e-brochure

 

Enquiry Now

Our Clients

tata-motors
logo_mahindra_rise
ashok-leyland
smlisuzu
tvs
svkm
volvo
toyota
maruti-suzuki
nissan
infiniti-mall
honda
eicher
cvgrp
baggit_logo
lear_logo
vip_logo